Lightweight Two Story Workshoplight Ssteel Construction Structure Buildings

Customization: Available
Material: Q345/235b Steel
Purlin: C/Z Section

Product Description

i

Basic Information

Model NO.
According to customer's demand
Surface Treatment
Painted or Galv
Window
Plastic Steel Window
Door
Rolling Door or Sliding Door
Service Life
More Than 50years
Roof & Wall Panel
Steel Sheet / Sandwich Panel / Rock Wool
Performance
Safety, Water-Proof, Sound Insulated
Type
H-Section Steel
Standard
GB
Carbon Steel
Q235
Connection
Welded Connection
Capacity
50000 Ton/Per Year
P

Product Description

Lightweight Two Story Workshop Steel Construction Structure Buildings

Steel Structure 1
Steel Structure 2
Steel Structure 3

Steel structure is the third generation construction. It combines H section beams & columns and c/z section steel profiles into the frame with the corrugated steel sheet or sandwich panel as the envelope systems. The traditional reinforced concrete construction has already been replaced by this kind of construction in developed countries.

Construction detail
Frame detail
No. Sort Name Specification
1SpecificationLengthNo limited
2WidthLess than 11m
3Wall height2600mm/2800mm
4Roof slope15°
5Standard AccessoryWall board75mm thickness sandwich panel (Polystyrene foam)
6Roof boardColor steel corrugated sheet, 0.5mm thickness
7Outside doorSecurity door, 900*2100mm
8WindowPVC, white color, 1200*1200mm, with fly screen
9Post/PurlineSquare steel tube, Material: Q235, Painted
10Technical ParameterBearing load30kg/m2
11Wind pressure0.45KN/M2
12Temperature-20 ºC to 50ºC
Panel detail
Connection detail
Steel components

Our Advantages

Competitive PricesHigh production capacity (300,000 tons annually) ensures cost-effective manufacturing.
Fast DeliveryDesign, fabrication, and supply of simple buildings in approximately 8-10 weeks.
Site SupervisionOn-site supervisors ensure quality and safety during construction.
High QualityProducts meet SGS, BV, and ISO standards with rigorous in-house quality control.
After SalesDedicated Project Coordinators manage your project from start to finish.
?

Quotation Requirements

Please provide the following information for an accurate quote:

1LocationCountry and area of construction
2SizeLength * Width * Height (mm)
3Wind LoadMax wind speed (kn/m2, km/h, or m/s)
4Snow LoadMax snow height (kn/m2 or mm)
5Earthquake ResistanceRequired level
6InsulationEPS, Fiberglass, Rockwool, or PU sandwich panels
Project Example
F

Frequently Asked Questions

What is the expected lifespan of these steel buildings?
Our steel structures are designed for durability, with a service life exceeding 50 years.
What materials are used for wall and roof insulation?
We offer several options including double color-steel sandwich panels with polystyrene (EPS) foam, rock wool, or fiberglass wool.
Are the structures resistant to extreme weather?
Yes, they are designed to withstand wind pressures of 0.45KN/M2 and temperatures ranging from -20ºC to 50ºC.
How long does the delivery and erection process take?
Most buildings are designed, fabricated, and delivered within approximately 8 to 10 weeks, depending on the project complexity.
Is on-site technical support available?
Yes, a site supervisor is present during construction to ensure work is carried out satisfactorily and safely.
Can the buildings be customized?
Absolutely. All dimensions (length, width, height) and accessory specifications are tailored to the customer's specific demands.

Related Products